The new development will have seven levels of office accommodation above ground floor, and will be served from plantroom areas located at basement and roof levels. This is a complex refurbishment with temporary and permanent utilitys solutions required.
Edc in a very tight timeframe carried out a design risk assessment as well as proposing several alternative design solutions to reduce program, capital and running costs and critically co2 emmissions.