Wigmore House

Cost: Confidential
Client: Wates Construction
Stage: Construction

Victoria Street - EDC

CASE STUDIES



DETAILS

The new development will have seven levels of office accommodation above ground floor, and will be served from plantroom areas located at basement and roof levels. This is a complex refurbishment with temporary and permanent utilitys solutions required.

Edc in a very tight timeframe carried out a design risk assessment as well as proposing several alternative design solutions to reduce program, capital and running costs and critically co2 emmissions.